Audit and examination of RAS fish farm projects

Independent assessment of a project or existing farm: technology, water and oxygen balance, treatment units, economics and risks. We help you understand what’s wrong and what to improve – before investing in construction and equipment.

Short answer

Fish farm audit and engineering review helps fix the technical logic of a fish farm before major spending on construction or equipment. It reduces redesign risk and gives a clear implementation path. An audit checks design decisions, existing equipment, water treatment, production bottlenecks and operational risks before new investment decisions.

When is an audit needed?

  • Before purchasing/investing: check the feasibility of someone else’s project or business plan.
  • The operating farm does not meet the following indicators: low growth, increased mortality, unstable water.
  • Finished project from another contractor: independent verification of calculations and configurations.
  • Reconstruction: assessing what can be saved and what can be remade.

What we check

  • Technology: appropriate for fish species, stages and target power.
  • Water balance and water exchange: calculation according to pollutants, and not “just in case”.
  • Oxygen and gas mode: oxygenation, degassing, redundancy.
  • Cleaning: mechanical (drum, hydrocyclones), biofilter, disinfection.
  • Energy and economics: energy consumption, FCR, OPEX/CAPEX, payback.
  • Building and utilities: requirements and loads, bottlenecks.

How it goes

Input data and questionnaire. We collect documents, design calculations, data on water and current indicators.

Analysis. We check technology, balances, equipment and economics; if necessary, visit the site.

Conclusion A report with identified risks, errors and recommendations for correction.

Next step. If necessary, design, reconstruction or support.

FAQ

Frequently asked questions

Clear answers to the questions that usually appear before a RAS fish farm project starts.

When do you need fish farm audit and engineering review?

It is useful before buying equipment, starting construction, renovating an existing farm or launching a new production line, when an engineering mistake can be expensive.

Can the work start remotely?

Yes. Initial review, calculations and consultations can start from drawings, photos, videos, water analysis and a questionnaire. Site visits are added when they are technically necessary.

What should be prepared before the first discussion?

Prepare the target fish species, planned capacity, country or region, site or building data, water source, available utilities, existing drawings and business goals.

Order an audit of a project or farm

Describe the object and task - we will estimate the scope of the audit and the timing.

Or write to Telegram: go to chat →

Design, equipment, installation and launch of RAS fish farms for sturgeon, trout, African catfish and other fish species.

Offices and details
Sway LLPBIN 160840020113Astana: Turan Avenue, 16, office 8Russia: Varshavskoe shosse, 33, building 1, Moscow
© 2026 Aquafarmer · Turnkey RAS fish farmsThe numbers on the page are approximate. Exact indicators are calculated individually.
Aquafarmer project photo