Development of a business plan and preparation of a RAS fish farm

Pre-design preparation is the first working stage before designing a RAS complex. We define the concept of the farm, select technology, calculate resources and the integrated economy, formulate requirements for the site, building and engineering systems. As a result, a set of materials for the investment decision and transition to design.

Truss design
Pre-design study of the RAS complex - technological layoutPre-design study of the RAS complex - technological layout
Short answer

Fish farm feasibility and business planning helps fix the technical logic of a fish farm before major spending on construction or equipment. It reduces redesign risk and gives a clear implementation path. A feasibility stage clarifies the site, production concept, basic economics, risks and next steps before major investment.

What is this

What is pre-project preparation

This is an enlarged engineering, technological and economic study of the future economy. It is needed not for issuing construction documentation, but in order to understand, even before design, what kind of complex is needed, what resources will be required and how realistic the project is in specific conditions.

The type of aquatic organism, productivity, cultivation scheme, composition of technological modules, requirements for the site and building, needs for water, energy, heating and ventilation, as well as capital and operating costs are studied.

ImportantThe standard composition of pre-project preparation is a basic technical and technological and enlarged economic study. A detailed business plan according to bank standards, a design of the building and engineering systems, hydraulic calculations and some related work are not included by default and are agreed upon separately.
Why is this necessary?

Why pre-design before design and procurement?

The RAS farm is an investment and production facility. A mistake at the start leads not just to higher prices, but to incorrect power, inconvenient operation, poor economics, or alterations after launch. The three most common mistakes:

Error in concept

Wrong fish, power or technology - and the object does not meet the investor's goals. On paper the farm is profitable, but in reality it performs worse than expected.

Wrong budget

They underestimate installation, construction, networks, personnel, feed and startup - the project requires additional investments already in the process of implementation.

Inappropriate site

The building or site limits productivity, maintenance, and equipment layout. Correcting after the start is more expensive than checking beforehand.

The price of a mistakeThe cost of a mistake at the planning stage is from $50k to $940k and 1–2 years of lost time. The pre-design shows weaknesses before major expenses begin - and is included in the cost of further design.
Pre-project and business plan

How are pre-project and business plan related?

Pre-project preparation answers the question of what the facility should be like in terms of technology, resources and basic economics - this is the working basis for the decision to launch. A business plan is the next level of project packaging for a bank, investor or subsidy: it is based on pre-project materials, but is drawn up separately to a specific standard.

By default they are not included in the standard composition

  • business plan according to the standards of banks and other organizations
  • detailed marketing research and supplier analysis
  • detailed financial model beyond basic aggregated calculations
  • design of sections not related to the “TX” section
  • hydraulic calculations of pipelines, calculations of quality of life, electrical diagrams, examination and other special sections
Stage tasks

What key tasks does the stage solve?

1

Selecting a project concept

Type of aquatic organism, product format, productivity, growing cycle, composition of technological blocks.

2

Feasibility check

Requirements for the site, building, make-up water, heating, ventilation, sewerage, energy supply.

3

Selection of technology

Basic technological line, operating modes, selection and description of modules, equipment requirements.

4

Resource Planning

Planting material, feed, water, electricity, heating, wastewater, personnel, operations.

5

Enlarged economy

Capital and operating costs, profit, payback, basic inputs for financing.

6

Preparing for the next stage

A set of initial solutions and enlarged technical specifications for the transition to design.

Scope of work

What work is being done

DirectionScope of work
Initial solutionsCollection and analysis of initial data, formation of technical specifications for the technological part, clarification of project goals.
Technology and productionDescription of the aquatic organism and conditions of detention, diagram of the production line, description of the modules, production plan, calculations of cycles and fish movements.
Raw materials and operationsPlanting material, feed, consumables, keeping fish, feeding, sorting, monitoring and maintenance of equipment.
Site and infrastructurePremises, enlarged requirements for the building, water supply and sewerage, heating, ventilation, energy supply, lighting, air and oxygen.
Equipment and layoutSpecification of main and additional equipment, complex layout, arrangement of equipment and premises.
Economics and project launchCapital and operating costs, consolidated profit and payback, calendar plan, list of suppliers.
Documentation

What kit does the customer receive?

The basic set of pre-design preparation includes enlarged calculations and explanatory materials.

SectionWhat does the customer get?
Summary and Summary ParametersSummary of the project, general table of complex parameters.
TechnologyDescription of the aquatic organism, conditions of detention, general scheme of the RAS and operation of the modules.
ProductionProduction plan, cycle calculations, fish movement through the pools, basic operations.
ResourcesPlanting material, feed, consumables, requirements for water and other resources.
OperationFish maintenance, feeding, sorting, equipment control and maintenance, personnel.
Equipment and premisesSpecification of equipment, description of premises, enlarged requirements for the building and engineering systems.
EconomicsCapital costs, operating costs, profit, payback.
ApplicationsTechnological map, technical line diagram, complex layout, suppliers' CP, calendar plan.

If necessary, the next level of detail

Technological project

Clarification of the layout and interfaces with the facility: layouts, technological diagrams of modules, high-altitude diagram, points of supply of water, sewerage, HVAC, electrical and lighting, technical specifications for subcontractors, pipeline plans and automation.

Working documentation

Installation details: assembly drawings and axonometry of pipelines, diagrams of oxygen pipelines, specifications of pipes, fittings and fittings, tank drawings, technical specifications for metal structures.

Formats

Four formats for project development

The choice depends on how detailed the farm needs to be worked out now - from an express guideline to an investment package for financing.

Express calculation

Quick reference

The order of the budget and composition of a typical farm without deep individual study.

Individual calculation

One scenario

Development of a specific option for your task: layout, equipment, open specification.

★ recommended

Pre-project

Recommended option

Optimal for the decision to launch: technology, site, economics, risks and roadmap.

Investment pre-project

For financing

Maximum elaboration for the bank, investors and partners: market, business plan, extended financial model.

SectionExpressIndividualPre-project ★Invest
Layout and placement of equipmentSketchDetailedDetailedDetailed
Specification and pricesAggregated by blocksOpen, by productOpen, by productOpen, by product
Calculation matrixWordExcel with formulasExcel with formulas
Calculation scenarios11up to 2up to 3
Investment calculationTechnology by blockTechnology, open prices+ construction (enlarged)+ construction + contractors’ CP
Explanatory noteBriefDetailedDetailed + market
FinmodelAccording to company standardsExpanded, for financing
Business plan and market analysisUNIDO / bank standard
Technology price guarantee±10%, no guarantee3 months6 months
Iterations of edits12
What to chooseFor most who are seriously considering a launch, the Pre-Project is optimal: it is deep enough to test the technology, site, budget, economics and risks, but does not overload with a banking business plan if it is not yet needed. “Individual calculation” - for a simple task with one scenario; “Invest pre-project” - when the materials will be viewed by the bank, investors or partners.

What is the result of the stage

  • A coherent concept of the farm and clear project boundaries.
  • Fixed requirements for the site, building, water, heating, ventilation, sewerage and electricity.
  • Understanding the composition of process units, equipment and general layout.
  • Integrated calculations for resources, personnel, capital and operating costs.
  • Basic model of project economics: costs, profit, payback.
  • A set of initial materials for the transition to design and business plan.

What is needed from the customer to get started?

  • topographic plan of the site - if the site has already been selected
  • plan of an existing building - during reconstruction
  • water analysis according to specified parameters
  • completed questionnaire and initial housekeeping instructions
Examples

Examples of completed materials

An example of ready-made pre-project preparation materials is a RAS project for growing Atlantic salmon 20 tons/year.

Project Summary
Project Summary
Scheme of operation of the RAS technological line
Scheme of operation of the RAS technological line
Layout of the complex and arrangement of equipment
Layout of the complex and arrangement of equipment
Production plan and cycle calculation
Production plan and cycle calculation
Economic calculation
Economic calculation
Project implementation schedule
Project implementation schedule
FAQ

Frequently asked questions

Clear answers to the questions that usually appear before a RAS fish farm project starts.

When do you need fish farm feasibility and business planning?

It is useful before buying equipment, starting construction, renovating an existing farm or launching a new production line, when an engineering mistake can be expensive.

Can the work start remotely?

Yes. Initial review, calculations and consultations can start from drawings, photos, videos, water analysis and a questionnaire. Site visits are added when they are technically necessary.

What should be prepared before the first discussion?

Prepare the target fish species, planned capacity, country or region, site or building data, water source, available utilities, existing drawings and business goals.

Application

Order pre-project preparation

Tell us about the idea, the type of fish and the site - we will discuss the scope of the pre-project and prepare a proposal. If necessary, we will help with a business plan for a bank or investor.

We’ll call you back, clarify the introductory information and offer the format and scope of the pre-project.

Design, equipment, installation and launch of RAS fish farms for sturgeon, trout, African catfish and other fish species.

Offices and details